Skip to content
  • There are no suggestions because the search field is empty.

Which Capacity Can Be Reshuffled?

Both sides of a reshuffle have to qualify in their own right:

Requirement

Newly booked capacity

Existing contracted capacity
Product type Monthly, Quarterly or Yearly, firm

Contract runtime of 1 year or more
Capacity category Firm Fixed freely allocable (FZK) or dynamically allocable (DZK)
Network point Belongs to TSO

Belongs to TSO
Timing Allocated within the last 10 days

No timing limit
Runtime Ends before the end of the next gas year
No runtime limit

 

 

The network point and direction of the newly booked capacity must also differ from at least one of your multi-year transactions, and neither side may have been converted or have an open surrender request against it.

If an annual product spans several gas years, only the first gas year can be reshuffled.